Construction May 2018
Construction Progress: May 2018
Posted on 05/29/2018
library work

It's getting easier every month to imagine our students and staff inside!

All concrete floors were poured on the second floor. Kitchen equipment is being installed. Drywall is going up and windows are going in to sections of the building. Exterior brick has been installed along the west and northeast side of the building. Over at Lobe Field, turf is being installed.

Next month, construction crews will focus work on classrooms, kitchen and administration area. Crews are working in multiple shifts with about 120 people on at a time. 

In the photo below, swipe the bar left or right to see how Oly is going from design to real life. Scroll down to see more photos from construction in May.